Back to the backflow review queue

Backflow assembly test: 205 Laurel Ct

Approved

Filed Nov 30, 2023 by Quinn Nguyen, Keystone Backflow Testing. Filed from a phone.

Report

Date of service
Nov 30, 2023
Assembly type
RP
Serial number
B731661
Size
3/4
Test gauge serial
G-2900
Gauge calibration date
Sep 6, 2023
Check valve 1
7.6 psid
Check valve 1 closed tight
Yes
Check valve 2
2.7 psid
Relief valve opened at
2.9 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Quinn Nguyen, current on the service date
  • All required fields present
  • Address matches parcel 001-69-01170
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

205 Laurel Ct
Owner: Hayden Calloway
Parcel 001-69-01170