Back to the backflow review queue
Backflow assembly test: Maple Leaf Market
ApprovedFiled Sep 1, 2026 by Reese Fairley, Clearwater Backflow Testing. Filed from a phone.
Report
- Date of service
- Sep 1, 2026
- Assembly type
- DC
- Serial number
- Z958156
- Size
- 4
- Test gauge serial
- G-9709
- Gauge calibration date
- Apr 14, 2026
- Check valve 1
- 7.3 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 3.2 psid
- Result
- Repaired and passed
- Repairs made
- Replaced check valve 1 rubber
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Reese Fairley, current on the service date
- All required fields present
- Address matches parcel 143-99-01076
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by J. Staff. The property's next due date is set and the owner gets a receipt.
Property
3333 Cedar Hollow Ln
Owner: Brandt Holdings LLC
Parcel 143-99-01076