Back to the backflow review queue

Backflow assembly test: Blue Heron Animal Hospital

Approved

Filed Jul 4, 2025 by Hayden Okafor, Northstar Backflow Testing. Filed from a phone.

Report

Date of service
Jul 4, 2025
Assembly type
RP
Serial number
B715997
Size
4
Test gauge serial
G-9863
Gauge calibration date
Sep 12, 2024
Check valve 1
7.9 psid
Check valve 1 closed tight
Yes
Check valve 2
1.5 psid
Relief valve opened at
2.4 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Hayden Okafor, current on the service date
  • All required fields present
  • Address matches parcel 131-69-01172
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

6527 Orchard Dr
Owner: Danner Holdings LLC
Parcel 131-69-01172