Back to the backflow review queue

Backflow assembly test: 226 Turkey Hill Way

Approved

Filed Jan 14, 2025 by Drew Vance, Clearwater Plumbing & Backflow. Filed from a phone.

Report

Date of service
Jan 14, 2025
Assembly type
DC
Serial number
W609270
Size
1
Test gauge serial
G-5610
Gauge calibration date
Jan 29, 2024
Check valve 1
0 psid
Check valve 1 closed tight
No
Check valve 2
1.8 psid
Result
Fail
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Drew Vance, current on the service date
  • All required fields present
  • Address matches parcel 045-74-01257
  • Readings in range, no flags
  • Result: needs follow-up. The property stays on the overdue list until a passing report arrives.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

226 Turkey Hill Way
Owner: Riley Ellery
Parcel 045-74-01257