Back to the backflow review queue

Backflow assembly test: Golden Apartments

Approved

Filed Aug 18, 2025 by Cameron Whitcomb, Patriot Plumbing & Backflow. Filed from a phone.

Report

Date of service
Aug 18, 2025
Assembly type
RP
Serial number
A406707
Size
1 1/2
Test gauge serial
G-4652
Gauge calibration date
Mar 14, 2025
Check valve 1
6.5 psid
Check valve 1 closed tight
Yes
Check valve 2
3.5 psid
Relief valve opened at
2.3 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Cameron Whitcomb, current on the service date
  • All required fields present
  • Address matches parcel 045-95-01175
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

522 Spring Branch Ct
Owner: Danner Holdings LLC
Parcel 045-95-01175