Back to the backflow review queue
Backflow assembly test: Maple Leaf Grill
ApprovedFiled Nov 19, 2025 by Parker Danner, Valley Backflow Testing. Filed from a phone.
Report
- Date of service
- Nov 19, 2025
- Assembly type
- RP
- Serial number
- W347786
- Size
- 1 1/2
- Test gauge serial
- G-8519
- Gauge calibration date
- Jul 13, 2025
- Check valve 1
- 7.5 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 1.6 psid
- Relief valve opened at
- 1 psid
- Result
- Repaired and passed
- Repairs made
- Replaced check valve 1 rubber
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Parker Danner, current on the service date
- All required fields present
- Address matches parcel 007-14-01328
- RP relief valve must open at 2.0 psid or more.
- Result: passing. Next due date resets when approved.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
7687 Orchard Trl
Owner: Harlow Holdings LLC
Parcel 007-14-01328