Back to the backflow review queue

Backflow assembly test: 7898 Orchard Rd

Approved

Filed Sep 8, 2026 by Parker Danner, Valley Backflow Testing. Filed from a phone.

Report

Date of service
Sep 8, 2026
Assembly type
RP
Serial number
A207995
Size
3/4
Test gauge serial
G-4903
Gauge calibration date
Feb 7, 2026
Check valve 1
5.4 psid
Check valve 1 closed tight
Yes
Check valve 2
1.4 psid
Relief valve opened at
3.2 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Parker Danner, current on the service date
  • All required fields present
  • Address matches parcel 007-61-01040
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

7898 Orchard Rd
Owner: Logan Wexler
Parcel 007-61-01040