Back to the backflow review queue
Backflow assembly test: Crossroads Dental
ApprovedFiled Jul 4, 2025 by Sam Fairley, Northstar Plumbing & Backflow. Filed from a phone.
Report
- Date of service
- Jul 4, 2025
- Assembly type
- RP
- Serial number
- Z490082
- Size
- 4
- Test gauge serial
- G-8854
- Gauge calibration date
- Jan 24, 2025
- Check valve 1
- 4.3 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 2 psid
- Relief valve opened at
- 4 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Sam Fairley, current on the service date
- All required fields present
- Address matches parcel 007-76-01282
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
5146 Spring Branch Ct
Owner: Danner Holdings LLC
Parcel 007-76-01282