Back to the backflow review queue

Backflow assembly test: 954 Orchard Ct

Approved

Filed Mar 4, 2025 by Parker Danner, Valley Backflow Testing. Filed from a phone.

Report

Date of service
Mar 4, 2025
Assembly type
RP
Serial number
K119618
Size
3/4
Test gauge serial
G-5434
Gauge calibration date
Jul 2, 2024
Check valve 1
6.9 psid
Check valve 1 closed tight
Yes
Check valve 2
2.4 psid
Relief valve opened at
2.8 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Parker Danner, current on the service date
  • All required fields present
  • Address matches parcel 007-87-01348
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

954 Orchard Ct
Owner: Quinn Okafor
Parcel 007-87-01348