Back to the backflow review queue

Backflow assembly test: Maple Leaf Car Wash

Approved

Filed Oct 3, 2026 by Emerson Brandt, Clearwater Backflow Testing. Filed from a phone.

Report

Date of service
Oct 3, 2026
Assembly type
RP
Serial number
W652781
Size
1
Test gauge serial
G-1763
Gauge calibration date
Mar 30, 2026
Check valve 1
7 psid
Check valve 1 closed tight
Yes
Check valve 2
1.7 psid
Relief valve opened at
3.5 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Emerson Brandt, current on the service date
  • All required fields present
  • Address matches parcel 007-86-01236
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

1839 Sycamore Ct
Owner: Hollins Holdings LLC
Parcel 007-86-01236