Back to the backflow review queue

Backflow assembly test: Maple Leaf Car Wash

Approved

Filed Oct 1, 2025 by Emerson Brandt, Clearwater Backflow Testing. Read in from a paper form and confirmed by staff.

Report

Date of service
Oct 1, 2025
Assembly type
RP
Serial number
W652781
Size
1
Test gauge serial
G-8210
Gauge calibration date
Aug 4, 2025
Check valve 1
0.9 psid
Check valve 1 closed tight
No
Check valve 2
3.3 psid
Relief valve opened at
2.5 psid
Result
Fail
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Emerson Brandt, current on the service date
  • All required fields present
  • Address matches parcel 007-86-01236
  • Readings in range, no flags
  • Result: needs follow-up. The property stays on the overdue list until a passing report arrives.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

1839 Sycamore Ct
Owner: Hollins Holdings LLC
Parcel 007-86-01236