Back to the backflow review queue

Backflow assembly test: 7706 Stone Gate Way

Approved

Filed Dec 30, 2025 by Sam Fairley, Northstar Plumbing & Backflow. Read in from a paper form and confirmed by staff.

Report

Date of service
Dec 30, 2025
Assembly type
PVB
Serial number
K620318
Size
1
Test gauge serial
G-3496
Gauge calibration date
Jul 19, 2025
Check valve 1
5 psid
Check valve 1 closed tight
Yes
Check valve 2
2.2 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Sam Fairley, current on the service date
  • All required fields present
  • Address matches parcel 007-29-01227
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

7706 Stone Gate Way
Owner: Jordan Harlow
Parcel 007-29-01227