Back to the backflow review queue

Backflow assembly test: 7706 Stone Gate Way

Approved

Filed Dec 9, 2024 by Parker Danner, Valley Backflow Testing. Filed from a phone.

Report

Date of service
Dec 9, 2024
Assembly type
PVB
Serial number
K620318
Size
1
Test gauge serial
G-6983
Gauge calibration date
Jul 25, 2024
Check valve 1
8.7 psid
Check valve 1 closed tight
Yes
Check valve 2
2.7 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Parker Danner, current on the service date
  • All required fields present
  • Address matches parcel 007-29-01227
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

7706 Stone Gate Way
Owner: Jordan Harlow
Parcel 007-29-01227