Back to the backflow review queue

Backflow assembly test: Blue Heron Grill

Approved

Filed Nov 10, 2026 by Parker Danner, Valley Backflow Testing. Filed from a phone.

Report

Date of service
Nov 10, 2026
Assembly type
RP
Serial number
K882952
Size
2
Test gauge serial
G-4062
Gauge calibration date
Mar 4, 2026
Check valve 1
0.5 psid
Check valve 1 closed tight
No
Check valve 2
2.9 psid
Relief valve opened at
3.7 psid
Result
Fail
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Parker Danner, current on the service date
  • All required fields present
  • Address matches parcel 007-72-01118
  • Readings in range, no flags
  • Result: needs follow-up. The property stays on the overdue list until a passing report arrives.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

6619 Turkey Hill Rd
Owner: Ashby Holdings LLC
Parcel 007-72-01118