Back to the backflow review queue

Backflow assembly test: Crossroads Market

Approved

Filed Nov 1, 2025 by Cameron Danner, Heritage Plumbing & Backflow. Filed from a phone.

Report

Date of service
Nov 1, 2025
Assembly type
RP
Serial number
Z375125
Size
2
Test gauge serial
G-7641
Gauge calibration date
Mar 20, 2025
Check valve 1
4 psid
Check valve 1 closed tight
Yes
Check valve 2
1.7 psid
Relief valve opened at
2.4 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Cameron Danner, current on the service date
  • All required fields present
  • Address matches parcel 021-96-01292
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

2021 Cedar Hollow Ct
Owner: Harlow Holdings LLC
Parcel 021-96-01292