Back to the backflow review queue
Backflow assembly test: 1028 Ridgeview Way
ApprovedFiled Aug 1, 2026 by Parker Ramirez, Heritage Plumbing & Backflow. Read in from a paper form and confirmed by staff.
Report
- Date of service
- Aug 1, 2026
- Assembly type
- RP
- Serial number
- A271382
- Size
- 3/4
- Test gauge serial
- G-3896
- Gauge calibration date
- Nov 27, 2025
- Check valve 1
- 6.1 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 3.4 psid
- Relief valve opened at
- 2.9 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Parker Ramirez, current on the service date
- All required fields present
- Address matches parcel 021-20-01024
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
1028 Ridgeview Way
Owner: Jamie Hollins
Parcel 021-20-01024