Back to the backflow review queue
Backflow assembly test: 8531 Old Church Trl
ApprovedFiled Jan 14, 2026 by Morgan Stroud, Patriot Plumbing & Backflow. Read in from a paper form and confirmed by staff.
Report
- Date of service
- Jan 14, 2026
- Assembly type
- PVB
- Serial number
- Z466868
- Size
- 3/4
- Test gauge serial
- G-9188
- Gauge calibration date
- May 31, 2025
- Check valve 1
- 6.9 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 1.8 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Morgan Stroud, current on the service date
- All required fields present
- Address matches parcel 021-81-01155
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.
Property
8531 Old Church Trl
Owner: Quinn Okafor
Parcel 021-81-01155