Back to the backflow review queue
Backflow assembly test: Main Street Bakery
ApprovedFiled Jan 3, 2026 by Drew Stroud, Clearwater Backflow Testing. Filed from a phone.
Report
- Date of service
- Jan 3, 2026
- Assembly type
- RP
- Serial number
- W882656
- Size
- 1
- Test gauge serial
- G-3992
- Gauge calibration date
- Sep 8, 2025
- Check valve 1
- 5.4 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 3.9 psid
- Relief valve opened at
- 2.5 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Drew Stroud, current on the service date
- All required fields present
- Address matches parcel 021-97-01240
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
7979 Orchard Rd
Owner: Ashby Holdings LLC
Parcel 021-97-01240