Back to the backflow review queue
Backflow assembly test: 2659 Orchard Way
ApprovedFiled Mar 21, 2025 by Logan Vance, Lakeside Backflow Testing. Filed from a phone.
Report
- Date of service
- Mar 21, 2025
- Assembly type
- PVB
- Serial number
- B401290
- Size
- 3/4
- Test gauge serial
- G-8906
- Gauge calibration date
- Jul 17, 2024
- Check valve 1
- 5.1 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 1.2 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Logan Vance, current on the service date
- All required fields present
- Address matches parcel 019-10-01029
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by J. Staff. The property's next due date is set and the owner gets a receipt.
Property
2659 Orchard Way
Owner: Alex Ashby
Parcel 019-10-01029