Back to the backflow review queue
Backflow assembly test: Hilltop Bakery
ApprovedFiled Jan 26, 2024 by Hayden Danner, Northstar Plumbing & Backflow. Filed from a phone.
Report
- Date of service
- Jan 26, 2024
- Assembly type
- DC
- Serial number
- K876501
- Size
- 1 1/2
- Test gauge serial
- G-4424
- Gauge calibration date
- Nov 20, 2023
- Check valve 1
- 5.1 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 2.6 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Hayden Danner, current on the service date
- All required fields present
- Address matches parcel 013-84-01316
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.
Property
3504 Quarry Rd
Owner: Fairley Holdings LLC
Parcel 013-84-01316