Back to the backflow review queue
Backflow assembly test: Golden Animal Hospital
ApprovedFiled Jul 12, 2025 by Logan Benton, Patriot Plumbing & Backflow. Read in from a paper form and confirmed by staff.
Report
- Date of service
- Jul 12, 2025
- Assembly type
- RP
- Serial number
- B254806
- Size
- 1 1/2
- Test gauge serial
- G-6857
- Gauge calibration date
- Oct 20, 2024
- Check valve 1
- 5.4 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 2.5 psid
- Relief valve opened at
- 1.7 psid
- Result
- Repaired and passed
- Repairs made
- Replaced check valve 1 rubber
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Logan Benton, current on the service date
- All required fields present
- Address matches parcel 013-85-01120
- RP relief valve must open at 2.0 psid or more.
- Result: passing. Next due date resets when approved.
Decision
Approved by J. Staff. The property's next due date is set and the owner gets a receipt.
Property
429 Fox Run Way
Owner: Harlow Holdings LLC
Parcel 013-85-01120