Back to the backflow review queue
Backflow assembly test: Main Street Apartments
ApprovedFiled Sep 4, 2026 by Logan Benton, Patriot Plumbing & Backflow. Read in from a paper form and confirmed by staff.
Report
- Date of service
- Sep 4, 2026
- Assembly type
- DC
- Serial number
- B559202
- Size
- 1 1/2
- Test gauge serial
- G-3114
- Gauge calibration date
- Jun 7, 2026
- Check valve 1
- 4 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 2.4 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Logan Benton, current on the service date
- All required fields present
- Address matches parcel 013-88-01353
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.
Property
4543 Quarry Trl
Owner: Okafor Holdings LLC
Parcel 013-88-01353