Back to the backflow review queue
Backflow assembly test: 9882 Mill Creek Ct
ApprovedFiled Jun 26, 2026 by Logan Benton, Patriot Plumbing & Backflow. Filed from a phone.
Report
- Date of service
- Jun 26, 2026
- Assembly type
- DC
- Serial number
- Z878729
- Size
- 3/4
- Test gauge serial
- G-7266
- Gauge calibration date
- Apr 29, 2026
- Check valve 1
- 6.9 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 2.8 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Logan Benton, current on the service date
- All required fields present
- Address matches parcel 013-29-01176
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by J. Staff. The property's next due date is set and the owner gets a receipt.
Property
9882 Mill Creek Ct
Owner: Logan Ramirez
Parcel 013-29-01176